Proyek & Pengalaman Kami

Oil & Gas

PT Freeport

Papua

Pipeline Installation & Maintenance

Contract: 6 months

|

Completed: 5 months

Faster than schedule

Fabrication

Petronas Indonesia

Jakarta

Piping Fabrication & Installation

Contract: 5 months

|

Completed: 4.5 months

Faster than schedule

Shutdown

Amman Mineral

Papua

Industrial Shutdown Services

Contract: 3 months

|

Completed: 2.5 months

Faster than schedule

Power Plant

PT PLN (Persero)

Suralaya, Banten

Boiler Overhaul & Maintenance

Contract: 4 months

|

Completed: 3.5 months

Faster than schedule

Oil & Gas

Pertamina EP

Balikpapan, Kalimantan Timur

Pipeline Installation & Maintenance

Contract: 6 months

|

Completed: 5 months

Faster than schedule